Thursday, 20 May 2010

Wansford River Bridge Works

The permissive footpath alongside the railway at Wansford river bridge has had to be closed to pedestrians for 3-4 weeks whilst the bridge spans undergo repairs and painting by contractors. The railway part of the bridge is still operational and is running as normal.


The east span of the pedestrian walkway has been temporarily removed to allow access to repair the steelwork. Mind the gap!