Not much to report from me this week, as I have been too busy to call by the railway. However a couple of weeks ago I managed to grab these shots of TWO platform trolleys undergoing reconstruction - Andy is making a lovely job of these. There may be plans in the pipeline to load them with old-fashioned luggage if undercover winter storage space can be found.
Trolley 1 components, completely rebuilt and painted.
More components for trolley 1 on the bench. Since these photos, this trolley has been assembled but for some unknown reason I didn't get a picture!
Trolley 2 in grey undercoat.
That's about it until next time - don't forget to watch Eastenders on Friday, BBC1 at 8pm - which should feature the level crossing scenes shot at NVR!